Choose the guide for the task in front of you: prepare a feasibility trial, configure a smart camera, connect a GigE camera or build a PC-based inspection. Each link states the software or hardware scope and the result to work towards.

  • SCMVS manual

    For supported SC-series smart cameras in SCMVS. Follow connection, network, trigger and inspection configuration. Check the model-specific wiring notes, especially the distinction between SC2000 and SC2000E.

    Related: Cameras·Software

  • SC1000 / SC2000 quick start

    For a first SC1000/SC2000 commissioning session. Progress from connection and a usable image to one validated inspection, a fresh PLC result and a restart test.

    Related: vision architecture

  • Vision feasibility checklist

    For the project team before a feasibility trial. Collect samples, defect limits, cycle time, environment and interface requirements. Use the checklist to agree evidence and acceptance criteria before ordering a system.

    Related: How we work·Contact

  • Connect a GigE camera to a PC

    For industrial GigE cameras configured in Hikrobot MVS. Work through power and IP settings to a saved image, with symptom-based checks if discovery or acquisition fails.

  • First inspection in VisionMaster

    For a PC-based inspection in Hikrobot VisionMaster. Follow the version-labelled examples for Image Source, Fast Match and Blob Analysis, then challenge the decision with independent images.

  • Calculate GigE bandwidth

    Calculate the transmitted payload from image size, pixel format and frame rate. Use the worked examples to check a link budget before selecting a network connection.

  • Connect multiple GigE cameras

    Compare separate network ports with a shared switch. Check addressing, Power over Ethernet and simultaneous capture against the available transfer capacity.

  • Size the industrial PC

    Estimate processing, memory, storage and power requirements. Use the acceptance worksheet to benchmark the complete inspection rather than selecting a PC from processor name alone.

  • Prepare an SC1000/SC2000 setup session

    Collect hardware details, labelled product samples and PLC decisions before commissioning. Includes a readiness table and the evidence to retain when a setup stage fails.