Engagement

Full service, integration or VAR, which fits?

Compare complete-system delivery, integration and components with advice using the same responsibility table. Define who engineers, installs, tests and maintains the vision function before comparing quotations.

Choose the responsibility split before comparing prices

A component quotation and a complete-system quotation cover different work. Compare them against one list of required tasks: imaging, inspection configuration, machine communication, installation, acceptance and support. Work omitted from a supplier’s scope still needs an owner and a budget.

Sedeco supports complete-system delivery, integration within an existing machine, and components with application advice. The project agreement determines the actual boundary; the model names alone do not define a contract.

A responsibility table for the project discussion

The table below is a starting point to confirm with the project team. “Agreed system scope” means the named equipment and functions, rather than an automatic transfer of responsibility for the whole production line.

Work Complete-system delivery Integration Components with advice
Inspection requirement Customer defines production acceptance; Sedeco helps make it testable. Customer and machine owner define the requirement with Sedeco. Customer or integrator defines and validates it.
Camera, optics and lighting Sedeco selects within the agreed system scope. Sedeco selects for the agreed vision subsystem. Sedeco advises on the selected components; the implementing team validates the combination.
Inspection configuration Included where specified in the system delivery. Defined as part of the integration task. Remains with the implementing team unless separately commissioned.
Mechanical and PLC work Identify the included mechanics and control functions explicitly. Split between Sedeco and the machine owner or integrator. Customer or integrator arranges this work.
Installation and commissioning Included activities, site conditions and access are agreed. Vision commissioning is coordinated with the machine commissioning plan. Customer or integrator commissions the station.
Acceptance Customer and supplier assess the agreed system tests. Subsystem tests precede the machine-level acceptance. Implementing team carries out acceptance.
Software and recipe changes Name the owner and release procedure at handover. Name the owner at each software/interface boundary. Customer or integrator manages changes.
Maintenance and restoration Agree training, backups, spare parts and support scope. Split vision support from machine maintenance explicitly. Customer or integrator maintains the system; component support is separately defined.

When a complete-system scope helps

This model can fit a new inspection station when the customer needs an agreed package of feasibility, engineering, delivery and commissioning. Define the production interfaces, reject mechanism, installation window and acceptance samples early. State which upstream and downstream equipment remains outside the scope.

A feasibility trial should establish the uncertain image, handling or timing requirements before detailed design. It does not replace final acceptance on the delivered station.

When integration fits an existing machine

The machine builder, manufacturer or integrator retains responsibility for the wider machine. Sedeco delivers a defined vision task within it. Identify who provides triggers, receives results, modifies PLC logic and decides what the machine does after a missing or invalid result.

Test the interface before final site commissioning where practical. Include communication loss, restart, recipe changes and the restoration procedure. Agree who investigates a fault that crosses the camera, software and machine-control boundary.

What components with advice means

The term VAR, or value-added reseller, refers here to component supply with selection or configuration advice. It fits when your team can implement and validate the complete application. It does not automatically include custom inspection software, PLC engineering or site commissioning.

Ask for the exact part list, supported software versions and known compatibility requirements. If a sample trial or application configuration is needed, name it as a separate deliverable. A component warranty is not a guarantee that the complete inspection meets your process criteria.

Compare cost using the same work breakdown

For each model, total external charges and internal hours multiplied by their applicable rates. Add licences, travel, planned installation losses, training, spares and recurring maintenance. Confirm the treatment of extra trials, changes to the product range and return visits.

Use a low, expected and high estimate for unresolved work. Assign a test or decision that can narrow each uncertainty. A lower purchase price may leave more engineering inside your organisation; the cost sheet should make that work visible.

Agree acceptance and handover

Define representative good products, defects and borderline cases, together with limits for missed defects, false rejects and result time. State the conditions for supplier testing and on-site testing. Record who approves the outcome and how open findings are resolved.

The handover should identify hardware and software versions, configuration backups, operator instructions, restore tests and support contacts. Test at least one restoration or restart appropriate to the system before closing the project.

For the first discussion, bring the production requirement, existing engineering capacity and the work you want Sedeco to take on. The audience overview explains the different starting points for machine builders, manufacturers and integrators.

Vincent van Montfoort

Talk through your application.

Discuss the engineering already available in your organisation and the responsibility you want Sedeco to take. This clarifies which form of cooperation fits.